Irrigation Projects

 

There are 478 number of medium or major irrigation projects as per India-WRIS database commanding of about 36.12 percent total geographical area of the basin. Nearly half of this command area falls in Uttar Pradesh which, at 97.13 percent coverage, is almost entirely blanketed by irrigation projects. Though Bihar has second largest command area (59,392 Sq.km.), Haryana has second highest command area (38,683 Sq.km) in terms of percentage geographical area (87.5 %). The Madhya Pradesh state, despite having the most overall projects with 364, achieves only the third highest total command area at about 48,628 Sq.km and a mere 15.78 percent coverage due to the fact that most of its projects are of a medium size. Where as, Himachal Pradesh area has the least irrigation command area that is 0.64 percent of its total geographic area.

 

The major and medium irrigation projects in the basin are distributed like 107 MMIR projects in Uttar Pradesh, 98 projects in Rajasthan, 82 projects in Madhya Pradesh, 77 projects in Jharkhand, 56 projects in Bihar, 31 projects in West Bengal, 12 in Uttarakhand, 6 projects in Haryana, 4 projects in Chhattisgarh, and one project in Himachal Pradesh. Some of the major irrigation projects in Ganga basin are Sutlej-Yamuna Canal Major Irrigation Project (Haryana), Sarda Canal Major Irrigation Project (Uttar Pradesh), Saryu Nahar Pariyojana Major Irrigation Project (Uttar Pradesh), Ramganga Canal Major irrigation Project (Uttar Pradesh). The more details of each Major and Medium Irrigation Projects along with their surrogate information is available at Major/Medium irrigation projects with surrogate information

 

There are 45 Lift Irrigation Schemes in the Ganga basin. They are spread in four states with 27 projects in Uttar Pradesh, 9 projects in Bihar, 6 projects in Haryana and 3 projects in Madhya Pradesh. Out of 19 sub-basins of Ganga, only 10 sub-basin have lift irrigation schemes. The Yamuna Lower sub-basin contains the maximum 7 lift schemes out of which six are in Uttar Pradesh and one in Madhya Pradesh. They are Augasi, Kishanpur, Yamuna, Chillimal, Umarahat and Jarauli Lift Irrigation Schemes are in Uttar Pradesh and Renhat Lift Irrigation Scheme in Madhya Pradesh. The Yamuna Upper sub-basin contains only one lift irrigation scheme i.e. Jawahar Lal Nehru Lift Irrigation Scheme Stage III, IV, V, VI, VII and VIII. The Ghaghara confluence to Gomti confluence also has 7 different Lift Irrigation Scheme namely Zamania, Narainpur, Deokali, Larma, Chausa, Karamnasa and Gyanpur Lift Irrigation Scheme. The next maximum lifts schemes are in Ghaghara sub-basin with 6 lift schemes and they are Sarju Lift Irrigation Scheme Stage- I & II, Kwano, Tanda, Gola and Dohrighat Lift Irrigation Scheme.

 

The Chambal Lift Irrigation Scheme with Stage I and Stage - II are the only major irrigation scheme in the Chambal lower sub-basin and Parwan Lift Irrigation Scheme is the only major irrigation scheme in the Chambal upper sub-basin. Three irrigation schemes come under Gandak and other sub-basin are Surajgarh Lift Irrigation Scheme, Bateshwarasthan Lift Irrigation Scheme Phase- I Stage- I & II and Dhakranalla Lift Irrigation Scheme Phase-I Stage- I & II and Phase II Stage-I. The Sone sub-basin has majorly two irrigation schemes specifically Gopad and Sone Lift Irrigation Scheme Stage- I, II, III and IV. In Tons and Upstream of Gomti confluence to Muzaffarnagar two each irrigation schemes exist and they are Tons, Dhoba Lift Irrigation Scheme and Bhupali Lift Irrigation Scheme, Dalmau Lift Irrigation Scheme Stage- I, II respectively. The further details of each lift irrigation schemes are given below.

Lift Irrigation projects with surrogate information

Sl.

No.

Name of Project

Off take

point

Type of

pump

No. of

pumps

Horse Power of pumps

Lift

(m)

Discharge

(Cumec)

1

Augasi Lift Irrigation Scheme

River

 

4

800

35.00

1500.00

2

Bateshwarasthan Lift Irrigation Scheme I Stage - II

Reservoir

Centrifugal

12

7 nos. of 850 H.P.

5 nos. of 1800 H.P.

29.00

27.20

3

Bateshwarasthan Lift Irrigation Scheme Phase - I Stage - I

River

Centrifugal

12

 6 nos of 850 H.P.    6 nos of 1800 H.P.

23.00

27.20

4

Bhupali Lift Irrigation Scheme

River

 

 

 

 

 

5

Chambal Lift Irrigation Scheme Stage - I

River

 

4

 

26.40

17.00

6

Chambal Lift Irrigation Scheme Stage - II

River

 

4

 

31.10

17.00

7

Chausa Lift Irrigation Scheme

River

 

 

 

 

 

8

Chillimal Lift Irrigation Scheme

River

 

4

495

30.00

3.40

9

Dalmau Lift Irrigation Scheme Stage - I And Stage - II

River

 

 

 

 

 

10

Deokali Lift Irrigation Scheme

Canal

Centrifugal

10

 

 

3.40

11

Dhakranalla Lift Irrigation Scheme Ph - I Stage - I

River

 

7

500

15.40

8.61

12

Dhakranalla Lift Irrigation Scheme Ph-II Stage - I

Canal

 

4

410

15.39

2.83

13

Dhakranallah Lift Irrigation Scheme Ph - I Stage - II

Canal

 

6

450

13.11

6.80

14

Dhoba Lift Irrigation Scheme

River

 

5

 

 

0.75

15

Dohrighat  Lift Irrigation Scheme

 

 

12

60, 75

17.50

16.98

16

Dohrighat Lift Irrigation Scheme

Canal

 

10

75

17.50

19.10

17

Gola Lift Irrigation Scheme

River

 

6

1663

 

10.19

18

Gopad Lift Irrigation Scheme

River

 

5

1825

21.17

3.00

19

Gyanpur Lift Irrigation Scheme

 

 

 

 

 

38.22

20

Jarauli Lift Irrigation Scheme

River

 

8

66000 KVA

 

11.32

21

Jawarhar Lal Nehru Lift Irrigation Scheme JLN Canal - III

Canal

 

 

 

7.00

 

22

Jawarhar Lal Nehru Lift Irrigation Scheme JLN Canal -IV

Canal

 

 

 

7.00

 

23

Jawarhar Lal Nehru Lift Irrigation Scheme JLN Canal - V

Canal

 

 

 

7.00

 

24

Jawarhar Lal Nehru Lift Irrigation Scheme JLN Canal -VI

Canal

 

 

 

7.00

 

25

Jawarhar Lal Nehru Lift Irrigation Scheme JLN Canal -VII

Canal

 

 

 

7.00

 

26

Jawarhar Lal Nehru Lift Irrigation Scheme JLN Canal VIII

Canal

 

 

 

 

 

27

Karamnasa Lift Irrigation Scheme

River

 

5

Pump1 (2 nos) : 500

Pump2 (3 nos) : 840

 

16.14

28

Kishanpur Lift Irrigation Scheme

 

 

 

 

 

 

29

Kwano Lift Irrigation Scheme

River

 

 

 

 

 

30

Larma Lift Irrigation Scheme

River

 

 

 

 

 

31

Narainpur Lift Irrigation Scheme

Reservoir

 

16

17480 KVA

 

118.00

32

Parwan Lift Irrigation Scheme

River

 

 

 

 

 

33

Renhat Lift Irrigation Scheme

Canal

 

 

 

 

 

34

Sarju Lift Irrigation Scheme

Canal

 

 

 

 

 

35

Sarju Lift Irrigation Scheme Stage - II

Canal

 

 

 

 

 

36

Sone Lift Irrigation Scheme

River

 

12

22000 KVA

 

660.00

37

Sone Lift Irrigation Scheme Stage - II

Canal

 

 

 

 

 

38

Sone Lift Irrigation Scheme Stage - III

Reservoir

 

 

 

 

 

39

Sone Lift Irrigation Scheme Stage - IV

Canal

 

 

 

 

 

40

Surajgarh Lift Irrigation Scheme

River

 

2

400 H.P.

 

3.40

41

Tanda Lift Irrigation Scheme

 

 

 

 

 

 

42

Tons Lift Irrigation Scheme

River

 

12

 

 

17.00

43

Umarahat Lift Irrigation Scheme

River

 

3

 

 

0.71

44

Yamuna Lift Irrigation Scheme

River

 

 

 

 

 

45

Zamania Lift Irrigation Scheme

River

 

 

 

 

 

According to India WRIS database there are about 31 Extension, Renovation and Modernization (ERM) projects in the Ganga basin. Out of which 22 projects are completed and 9 projects are still ongoing. Some of the major ERM projects in Ganga basin are Remodeling of Agra Canal, Remodeling of Bhimogoda head works, Remodeling of Eastern Yamuna Canal, Sone Barrage Remodeling and Link Canal and Extension of Kosi Canal System including the Raipur canal etc.